Ras Abu Fontas ‘B’ Power and Desalination Plant

The scope of work consisted of civil works for a power station comprising a 625 MW power plant (5 combined cycle gas turbines) and a 33 million GPD Desalination Plant (5 heat recovery boilers and 5 evaporator units).

The works comprised all onshore civil and building works including foundations, turbine hall, service tunnels, pipe and cable trenches, together with central control and administration building and 20 other technical / industrial buildings. In addition to the design and construction of HVAC, plumbing and electrical services to turbine hall and buildings.

Civil works also included the construction of two concrete water reservoirs of 5 million gallons capacity each, infrastructure and underground services, roads, paving and landscaping.