Q-Chem Site Preparation Phase I
The scope of work consisted of the construction of a platform for the new petrochemical plant. The scope included a 1.3 Km long access road, site fill of the overall plot area by levelling and compacting existing sand dunes (1,300,000 m³), capping the overall site with a 200mm layer of desert fill (200,000 m³), as well as providing slope protection at the shore edge.
The scope of work consisted of the construction of a platform for the new petrochemical plant. The scope included a 1.3 Km long access road, site fill of the overall plot area by levelling and compacting existing sand dunes (1,300,000 m³), capping the overall site with a 200mm layer of desert fill (200,000 m³), as well as providing slope protection at the shore edge.