“C” Ring Road

The scope of work consisted of the re-construction of a 3.5 km long dual carriageway including 3 roundabouts, re-routing of existing services that involved high and low voltage electrical works, water and sewerage mains, in addition to the installation of an irrigation system in the central reservation. Works included earthworks, asphalt paving, street lighting and road markings.