Al Udeid Project – Package II

The scope of work consisted of general earthworks, runway, taxiways, roads, various buildings and concrete structures, covered aircraft parking and a large concrete apron. Also included, infrastructure works covering storm water, water distribution, electrical and communications networks, airfield lighting, security, fire-fighting and street lighting.

Principal quantities:

Bulk Excavation: 1,750,000 m³

Fill: 3,500,000 m³

Buried services: 270,000 Lm

Roads: 27,000 Lm

Asphalt: 425,000 Tons

Concrete: 204,000 m³