Ritz Carlton Hotel – First Stage

The scope of work consisted of structural works for a 25-storey reinforced concrete tower and adjoining steel framed podia, a 5-star luxury hotel. The tower includes a full height atrium and 400 bedrooms and executive suites. The podia includes conference facilities, restaurants, indoor tennis courts, a swimming pool and sports facilities.

The project was constructed on a fast track basis, and had complex structural design for 3 m deep transfer beams structures at 14 m height. Extensive temporary works, as well as design development and extensive engineering review were required. The works also included design, fabrication and installation of 2,500 tons of structural steel including four 21-ton steel trusses erected on the roof of the atrium, 106 m above ground.

Doha International Airport Terminal Extension

The scope of work consisted of the extension and renovation of the existing terminal buildings including the VIP lounge, as well as the construction of a new departure and transit lounge. Works included all electro-mechanical services, fittings and specialized finishes.

Al Khor Sports Club

The scope of work consisted of the construction of a Sports Club complex comprising sports halls and facilities, swimming pool, recreation rooms and offices with central air conditioning and other electro-mechanical services. In addition, the project had external works and structures containing a stadium with a grandstand and terracing, a running track and a practice pitch. External plant rooms, roads, car parks, external lighting, paving and boundary walls are also part of the Sports Club.

Doha Club

The scope of work consisted of the construction of a recreational and sports complex, including tennis and squash courts, swimming pool and jetty. Main building had sophisticated designs, in fair-faced concrete, with a 3,000 m² post-tensioned canopy including high quality finishes and electro-mechanical installations. The works also included infrastructure works, roadworks and landscaping.

Gulf Hotel (Marriott Hotel)

The scope of work consisted of the construction of a 14 storey high, 220 bedroom luxury hotel tower. The works included concrete structure, with electro-mechanical installations and associated external works.