Design & Build Works for Lusail Plaza Towers – Plot 1 and Plot 2 (BP12A and BP12B)

The scope consists of two Towers, 50 storey high (approx.219m tall), with elliptical plan. The Podiums are designed to cascade down in scale towards the sea and range in height from G+5 to G+2 storey. The basement contains car parking, services, and links to Light Rail Transit station. The Towers are crowned with cladded structural steel. The Façade has distinctive Fin profile. Built up area Plot 1: 229,596 m² and Plot 2: 249,828 m²

Al Janoub Stadium in Al Wakrah City Main Works and Master Plan

The scope of work consists of the design, engineering, construction, testing, commissioning and completion of a 40,000 seat two tiers FIFA-compliant stadium with a designated VVIP/VIP/Hospitality level. This includes masterplan works, community market and retail, energy centre, infrastructure, landscaping, utilities and road works within the site, in addition to all MEP works.

Challenges

Al Janoub Stadium in Al Wakrah City is a FIFA World Cup Qatar 2022™ stadium and the venue for the tournament’s quarter-finals. The unprecedented scale of the event and its significance both for Qatar and the region cannot be understated.

With an international event of this magnitude come stringent standards and requirements from the SC and FIFA, in line with global design and sustainability standards set out by the Global Sustainability Assessment System (GSAS) and Leadership in Energy and Environmental Design (LEED).

Khalifa Stadium and Museum – Total Renovation

The scope of work consisted of a total renovation of the Khalifa Stadium and Museum to have a 40,000 seating capacity, and to the latest FIFA standards.

The Works include all works and covers but not limited to:

  • Demolition works: dismantling & demolition of various structural elements, architectural finishes and MEP services. The main element being the lighting arch.
  • Construction works
  • Earthworks
  • Structural work including strengthening the existing RCC
  • Architectural finishes
  • MEP works
  • Design, supply, fabrication and installation of the roof tent and the supporting structure
  • Landscaping works

KATARA (KP/A261/12)-Construction, Completion and Maintenance of Fitness Center Facility

The scope of work consisted of the construction of a fitness centre building with various facilities and supporting infrastructure. This includes demolition works, the construction of a 3 floor building with Internal and external swimming pools, a gymnasium, a restaurant and other facilities. External works include soft and hard landscaping and paved areas.

Doha Convention Center (Package-BP02B)

The scope of work consisted of:

  • Architectural & MEP works for a two-Level Basement (135,000 m²)
  • Structural, architectural & MEP works for a superstructure (97,500 m²)

Passenger Terminal Complex-North Node-CP51

The scope of work consisted of procurement, construction, commissioning, in addition to the final design of some elements. The project also included facilities, equipment, building infrastructure, life safety, other systems and utilities/site improvement for the six-level North Node Building, the 3 level Concourse D and 3 level Concourse E.

Various Palaces and VIP Residences

The scope of work consisted of the design and build of prestigious palaces and VIP residences with high quality finishes and electro-mechanical services, specialist ornamental and decorative work, building management systems, swimming pools, fountains, hard and soft landscaping and access roads.